| BUSINESS
ASSESSMENT |
|
FEASIBILITY FOR THE FOURTH HIGH VOLTAGE LINE IN THE BUENOS AIRES-COMAHUE CORRIDOR |
|
|
|
| Outline: |
SIGLA
and Mercados Energéticos S.A., carried out the feasibility studies and
the economic assessment for the expansion of the 500 kV Buenos Aires-Comahue
Corridor with a new circuit (1300 km) to avoid the transport restrictions
between the region with the highest hydrothermal generation and the corresponding
load center. Tasks carried out by SIGLA included:
|
| Period: |
March
1994—February 1995 |